Home


Design Philosophy


Children’s Treatment Center – Albuquerque, NM

2nd story addition to an existing office building. Scope included updating the lateral systems to meet current code requirements.


500 Marquette – Albuquerque, NM

Upgraded the common areas to a new customer focused environment.


Staybridge Suites – Denver, Colorado

Remodeled an existing 5 story office building into a new 8 story hotel. Design included seismic retrofit of the existing concrete columns to meet current seismic requirements.


Hyatt Place – Colorado Springs, Colorado

New 7 story platform construction hotel building utilizing precast construction on the first 2 levels with CFS studs and long span decking for the upper levels.